GET A QUOTE

for a quick no obligation quote call
020 8930 5668 or enquire using the form below



Waste Management – LUCIA Building

A further aspect taken into consideration is waste management during the construction phase as well as during the building’s use. The project includes a plan for studying all the waste generated during the building’s life-cycle, and the creation of compost from vegetable waste is also envisaged. Finally, the waste generated during future demolition of the building has also been studied with a view to securing the maximum possible recovery of the materials used.

Stage 1: Construction

Stage 2: Use

Phase 3: Demolition

Sources: http://lucia-building.blogspot.com.es/p/7-gestion-de-residuos.html
http://lucia-building.blogspot.com

 

Leave a Reply

Your email address will not be published. Required fields are marked *